asagigo.com
Login « Sidebar
Asagi Goi Gallery » Kitchen Renovation, 2009
 
Page: 1 2 3 4 5
 

Kitchen Renovation, 2009

The kitchen project, at least the concept, was born around the October 2008. The demo (wall breaking?) didn't start till July 7, the Tuesday after the July 4th holiday weekend. The project was 99% finished about 7 weeks later, and we've been stuck at the 99% finished stage for quite a few weeks, waiting for the punch list to be finished, including replacing and installing a new bamboo floor ... original floor was not installed properly and there may have been a product defect.

Date: 10/29/2009
Owner: Captain Ken
Size: 30 items
P1010146.JPG
 
 
View Panorama

P1010146.JPG

Date: 05/30/2009
Views: 31
P1010385.JPG
 
 

P1010385.JPG

Date: 07/07/2009
Views: 25
P1010386.JPG
 
 

P1010386.JPG

Date: 07/07/2009
Views: 25
P1010387.JPG
 
 

P1010387.JPG

Date: 07/07/2009
Views: 26
P1010388.JPG
 
 

P1010388.JPG

Date: 07/07/2009
Views: 26
P1010391.JPG
 
 

P1010391.JPG

Date: 07/07/2009
Views: 29
 
Page: 1 2 3 4 5
 

Actions

Advanced Search
RSS Feed for this Album View Slideshow View Slideshow (Fullscreen)

Asagi Goi Gallery

1. The Saga of... ... 7. Northern... 8. ADSW 2003... 9. Leslie's... 10. Mountain... 11. Ken's 60th ... 12. Endorphin, ... 13. Kitchen...
Powered by Gallery v2.2 Copyright © 2006- 2007. All rights reserved.